Language:
English
繁體中文
Help
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
Excessive Entry, Investment and Cong...
~
ProQuest Information and Learning Co.
Excessive Entry, Investment and Congestion Cost in the Electricity Industry.
Record Type:
Language materials, manuscript : Monograph/item
Title/Author:
Excessive Entry, Investment and Congestion Cost in the Electricity Industry./
Author:
Hill, Alexander Mcgavock.
Description:
1 online resource (158 pages)
Notes:
Source: Dissertation Abstracts International, Volume: 78-10(E), Section: A.
Contained By:
Dissertation Abstracts International78-10A(E).
Subject:
Economics. -
Online resource:
click for full text (PQDT)
ISBN:
9781369785968
Excessive Entry, Investment and Congestion Cost in the Electricity Industry.
Hill, Alexander Mcgavock.
Excessive Entry, Investment and Congestion Cost in the Electricity Industry.
- 1 online resource (158 pages)
Source: Dissertation Abstracts International, Volume: 78-10(E), Section: A.
Thesis (Ph.D.)--University of Colorado at Boulder, 2017.
Includes bibliographical references
Electricity is a large and crucial US industry, with annual sales and investment of $390 billion and $80 billion respectively. Two important topics in the industry, over the past 25 years, are the restructuring of state markets and variation electricity demand. Both changes occurred during the largest increase in electricity capacity in US history, the "Gas Boom," which increased generating capacity by over 33 percent. This thesis links these topics with the increase in gas capacity and estimates their effect on electricity industry investment and prices. Chapter 1 estimates the effect of restructuring on US power plant investment, finding states that took steps toward retail competition built, on average, 593 MW more gas-fired CCGT power plants than if regulation had remained in place. Evidence of oversupply, bankruptcies, and falling capacity factors suggests this entry was excessive. Chapter 2 investigates the cause and cost of this excessive entry, finding it consistent with contagion, manager overconfidence, and falling long- term interest rates. The welfare cost is estimated to be $10.8 billion. Chapter 3 provides a first estimate of the impact of demand variance on electricity prices, finding an increase of 10 percent in demand variance leads to an increase of 9.7 percent in average state electricity prices. This impact was found to be significant across all three sectors of electricity use. These findings inform policymaker decisions in the future, suggesting states concern themselves with the lower and upper bound of capacity investment, while encouraging more measures to reduce daily and seasonal demand variation.
Electronic reproduction.
Ann Arbor, Mich. :
ProQuest,
2018
Mode of access: World Wide Web
ISBN: 9781369785968Subjects--Topical Terms:
555568
Economics.
Index Terms--Genre/Form:
554714
Electronic books.
Excessive Entry, Investment and Congestion Cost in the Electricity Industry.
LDR
:02875ntm a2200325Ki 4500
001
919083
005
20181116131020.5
006
m o u
007
cr mn||||a|a||
008
190606s2017 xx obm 000 0 eng d
020
$a
9781369785968
035
$a
(MiAaPQ)AAI10271882
035
$a
(MiAaPQ)colorado:14868
035
$a
AAI10271882
040
$a
MiAaPQ
$b
eng
$c
MiAaPQ
$d
NTU
100
1
$a
Hill, Alexander Mcgavock.
$3
1193569
245
1 0
$a
Excessive Entry, Investment and Congestion Cost in the Electricity Industry.
264
0
$c
2017
300
$a
1 online resource (158 pages)
336
$a
text
$b
txt
$2
rdacontent
337
$a
computer
$b
c
$2
rdamedia
338
$a
online resource
$b
cr
$2
rdacarrier
500
$a
Source: Dissertation Abstracts International, Volume: 78-10(E), Section: A.
500
$a
Adviser: Daniel T. Kaffine.
502
$a
Thesis (Ph.D.)--University of Colorado at Boulder, 2017.
504
$a
Includes bibliographical references
520
$a
Electricity is a large and crucial US industry, with annual sales and investment of $390 billion and $80 billion respectively. Two important topics in the industry, over the past 25 years, are the restructuring of state markets and variation electricity demand. Both changes occurred during the largest increase in electricity capacity in US history, the "Gas Boom," which increased generating capacity by over 33 percent. This thesis links these topics with the increase in gas capacity and estimates their effect on electricity industry investment and prices. Chapter 1 estimates the effect of restructuring on US power plant investment, finding states that took steps toward retail competition built, on average, 593 MW more gas-fired CCGT power plants than if regulation had remained in place. Evidence of oversupply, bankruptcies, and falling capacity factors suggests this entry was excessive. Chapter 2 investigates the cause and cost of this excessive entry, finding it consistent with contagion, manager overconfidence, and falling long- term interest rates. The welfare cost is estimated to be $10.8 billion. Chapter 3 provides a first estimate of the impact of demand variance on electricity prices, finding an increase of 10 percent in demand variance leads to an increase of 9.7 percent in average state electricity prices. This impact was found to be significant across all three sectors of electricity use. These findings inform policymaker decisions in the future, suggesting states concern themselves with the lower and upper bound of capacity investment, while encouraging more measures to reduce daily and seasonal demand variation.
533
$a
Electronic reproduction.
$b
Ann Arbor, Mich. :
$c
ProQuest,
$d
2018
538
$a
Mode of access: World Wide Web
650
4
$a
Economics.
$3
555568
655
7
$a
Electronic books.
$2
local
$3
554714
690
$a
0501
710
2
$a
ProQuest Information and Learning Co.
$3
1178819
710
2
$a
University of Colorado at Boulder.
$b
Economics.
$3
1193570
773
0
$t
Dissertation Abstracts International
$g
78-10A(E).
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10271882
$z
click for full text (PQDT)
based on 0 review(s)
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login