語系:
繁體中文
English
說明(常見問題)
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Configuration management for senior ...
~
Watts, Frank B.,
Configuration management for senior managers = essential product configuration and lifecycle management for manufacturing /
紀錄類型:
書目-語言資料,印刷品 : Monograph/item
正題名/作者:
Configuration management for senior managers/ Frank B. Watts.
其他題名:
essential product configuration and lifecycle management for manufacturing /
作者:
Watts, Frank B.,
出版者:
Amsterdam :Elsevier : : 2015.,
面頁冊數:
1 online resource.
標題:
Project management. -
電子資源:
https://www.sciencedirect.com/science/book/9780128023822
ISBN:
9780128026014 (electronic bk.)
Configuration management for senior managers = essential product configuration and lifecycle management for manufacturing /
Watts, Frank B.,
Configuration management for senior managers
essential product configuration and lifecycle management for manufacturing /[electronic resource] :Frank B. Watts. - Amsterdam :Elsevier :2015. - 1 online resource.
Front Cover; Configuration Management for Senior Managers; Copyright; Contents; List of Figures; Preface; Policies and Critical Practices; POLICIES; CRITICAL PRACTICES; PLATINUM POLICY; Chapter One -- Introduction; Chapter Two -- Why CM; THE DIRTY HALF DOZEN; PROCESS SPEED; THROW IT OVER THE WALL; QUALITY CONTROL FOR ENGINEERING; SUMMARY; Chapter Three -- CM System, Where to Start; PROCESS MEASUREMENTS; DISTRIBUTED CM; ORGANIZATION; CHAIN OF COMMAND; CM MANAGER; ISO STANDARDS AND CERTIFICATION; DOD/MILITARY STANDARDS; BEST OF THE BEST PRACTICES; STANDARDS RESPONSIBILITY; PEOPLE REQUIRED.
Configuration Management for Senior Managers is written to help managers in product manufacturing and engineering environments identify the ways in which they can streamline their products and processes through proactive documentation control and product lifecycle management. Experienced consultant Frank Watts gives a practitioner's view tailored to the needs of management, without the textbook theory that can be hard to translate into real-world change.
English.
ISBN: 9780128026014 (electronic bk.)
LCCN: 2015487617Subjects--Topical Terms:
558297
Project management.
Index Terms--Genre/Form:
554714
Electronic books.
LC Class. No.: TA190
Dewey Class. No.: 658.4/04
Configuration management for senior managers = essential product configuration and lifecycle management for manufacturing /
LDR
:04565cam a2200337 a 4500
001
1000335
006
o d
007
cnu|unuuu||
008
201225s2015 ne o 000 0 eng d
010
$a
2015487617
020
$a
9780128026014 (electronic bk.)
020
$a
0128026014 (electronic bk.)
020
$a
9780128023822
020
$a
0128023821
035
$a
(OCoLC)907924109
035
$a
EL2020154
040
$a
N$T
$b
eng
$c
N$T
$d
N$T
$d
IDEBK
$d
DG1
$d
E7B
$d
YDXCP
$d
CDX
$d
COO
$d
UMI
$d
DEBBG
$d
EBLCP
$d
DEBSZ
$d
OCLCF
$d
ESU
$d
UAB
$d
OCLCQ
$d
K6U
$d
MERUC
$d
STF
$d
D6H
$d
OCLCQ
$d
CEF
$d
OCLCQ
$d
UKMGB
$d
AU@
$d
OCLCQ
$d
WYU
$d
U3W
$d
CUY
$d
LOA
041
0
$a
eng
050
4
$a
TA190
082
0 4
$a
658.4/04
$2
22
100
1
$a
Watts, Frank B.,
$e
author.
$3
1292733
245
1 0
$a
Configuration management for senior managers
$h
[electronic resource] :
$b
essential product configuration and lifecycle management for manufacturing /
$c
Frank B. Watts.
260
$a
Amsterdam :
$b
Elsevier :
$b
BH,
$c
2015.
300
$a
1 online resource.
505
0
$a
Front Cover; Configuration Management for Senior Managers; Copyright; Contents; List of Figures; Preface; Policies and Critical Practices; POLICIES; CRITICAL PRACTICES; PLATINUM POLICY; Chapter One -- Introduction; Chapter Two -- Why CM; THE DIRTY HALF DOZEN; PROCESS SPEED; THROW IT OVER THE WALL; QUALITY CONTROL FOR ENGINEERING; SUMMARY; Chapter Three -- CM System, Where to Start; PROCESS MEASUREMENTS; DISTRIBUTED CM; ORGANIZATION; CHAIN OF COMMAND; CM MANAGER; ISO STANDARDS AND CERTIFICATION; DOD/MILITARY STANDARDS; BEST OF THE BEST PRACTICES; STANDARDS RESPONSIBILITY; PEOPLE REQUIRED.
505
8
$a
FUNCTION NAMERESPONSIBILITIES; REENGINEER OR CONTINUOUS IMPROVEMENT; PLAN TO IMPROVE; SUMMARY; Chapter Four -- CM and Software; SOFTWARE'S CURRENT CONDITION; MODERN TREND; PROCESS REDESIGN BEFORE SOFTWARE; CM'S ROLL IN SOFTWARE; WHAT CM SHOULD CONTROL-AND NOT; SOFTWARE (SW) AND FIRMWARE (FW) CONTROL; SUMMARY; Chapter Five -- Standard Foundation Blocks; STANDARDS WRITING; GENERAL STANDARDS; ACRONYMS AND DEFINITIONS; PART NUMBERS-SIGNIFICANT OR NOT; CLASS CODING; INTERCHANGEABILITY AND THE PART NUMBER; INTERCHANGEABILITY/PART NUMBER/REV CHANGE; ITEM/DOCUMENT NUMBERING.
505
8
$a
INTERCHANGEABILITY DISCUSSEDINTERCHANGEABILITY DEFINED; IDEAL PART/DOCUMENT NUMBER; ASSIGNMENT OF PART NUMBER AND REVISION LEVEL; REVISION LEVELS; REVISION CONTROL; PART MARKING; COGNIZANT ENGINEER; APPROVED MANUFACTURERS LIST; DEVIATIONS; SPARE PARTS; PUBLICATIONS; NAMEPLATE/SERIAL NUMBER/LABELS; TRANSMISSIONS TO CUSTOMERS; SUMMARY; Chapter Six -- Signatures on CM Documents; INVOLVEMENT VERSUS SIGNATURE; ONE AUTHOR AND ONE ACCEPTOR; SIGNING THE BOM OR PARTS LIST; JUST IN TIME; WHO OBTAINS SIGNATURES?; QUALITY ASSURANCE ROLE; TECHNICAL RELEASE; SIGNATURE ALTERNATIVES; SUMMARY.
505
8
$a
Chapter Seven -- Process ImprovementPROCESS SPEED-CASE HISTORY; CASE STUDY CHANGE PROCESS REENGINEERING; PROCESS TIME EXPECTATIONS; TEAMS; CHANGE BOARDS; FORMS; CUSTOMER ORDERS; BACKLOGS/WORK IN PROCESS; AGE REPORTS; SUMMARY; Chapter Eight -- Release Process; ENGINEERING AND COMPANY PHASES; PHASES OF RELEASE; RELEASE IN LEAD TIME; LEAD TIME RELEASE PERFORMANCE; TEAM IN RELEASE; SIGNATURES ON RELEASES; RELEASE PHASE CHART; RULES FOR RELEASE; PRODUCT SPECIFICATION RELEASE; CONTRACT/PLANNING PHASE; DESIGN AND DEVELOPMENT PHASE; PILOT PHASE; PRODUCTION PHASE; OBSOLETE; SOFTWARE RELEASE.
505
8
$a
RELEASE PROCESS STANDARDSRELEASE METRICS; RELEASE PROCESS QUALITY; RELEASE PROCESS FLOW; RELEASE TIME AND VOLUME MEASUREMENT; SUMMARY; Chapter Nine -- Bill of Material Process; DESIGN DATA; NEW PRODUCT BOM; PRODUCT COST; PLM AND ERP; ONE BOM ENTRY; OPERATIONS BOM DATA; ENGINEERING-FRIENDLY PARTS LIST; BOM CONTENT; STRUCTURING THE BOM; EVOLVE THE BOM; JUST-IN-TIME BOM; STRUCTURING FIRMWARE AND SOFTWARE; FEATURES AND OPTIONS; THE PERFECT BOM; BOM WORK FLOW; BOM STANDARDS; BOM METRICS; SUMMARY; Chapter Ten -- Request for Change Process; SEPARATE REQUEST PROCESS; DOES YOUR REQUEST PROCESS WORK? ; Cost reduction and improvements.
520
$a
Configuration Management for Senior Managers is written to help managers in product manufacturing and engineering environments identify the ways in which they can streamline their products and processes through proactive documentation control and product lifecycle management. Experienced consultant Frank Watts gives a practitioner's view tailored to the needs of management, without the textbook theory that can be hard to translate into real-world change.
546
$a
English.
588
0
$a
Vendor-supplied metadata.
650
0
$a
Project management.
$3
558297
650
0
$a
Configuration management.
$3
636137
650
0
$a
Manufacturing industries.
$3
654217
655
4
$a
Electronic books.
$2
local
$3
554714
856
4 0
$u
https://www.sciencedirect.com/science/book/9780128023822
筆 0 讀者評論
多媒體
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼[密碼必須為2種組合(英文和數字)及長度為10碼以上]
登入