語系:
繁體中文
English
說明(常見問題)
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Capacitated Lot Sizing Problems in P...
~
SpringerLink (Online service)
Capacitated Lot Sizing Problems in Process Industries
紀錄類型:
書目-語言資料,印刷品 : Monograph/item
正題名/作者:
Capacitated Lot Sizing Problems in Process Industries/ by Ravi Ramya, Chandrasekharan Rajendran, Hans Ziegler, Sanjay Mohapatra, K. Ganesh.
作者:
Ramya, Ravi.
其他作者:
Rajendran, Chandrasekharan.
面頁冊數:
XXXV, 196 p. 41 illus.online resource. :
Contained By:
Springer Nature eBook
標題:
Production management. -
電子資源:
https://doi.org/10.1007/978-3-030-01222-9
ISBN:
9783030012229
Capacitated Lot Sizing Problems in Process Industries
Ramya, Ravi.
Capacitated Lot Sizing Problems in Process Industries
[electronic resource] /by Ravi Ramya, Chandrasekharan Rajendran, Hans Ziegler, Sanjay Mohapatra, K. Ganesh. - 1st ed. 2019. - XXXV, 196 p. 41 illus.online resource.
Chapter 1. Introduction -- Chapter 2. CLSP: Real Life Applications and Motivation to Study Lot Sizing Problems in Process Industries -- Chapter 3. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods (CLSP:PCSC): Mathematical Model 1 (MM1) and A Heuristic for Process Industries -- Chapter 4. Further Development: Mathematical Model 2 (MM2) and A Comprehensive Heuristic for Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods for Peocess Industries -- Chapter 5. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods Assuming Sequencedependent Setup Times and Setup Costs (CLSP-SD-PCSC): Mathematical Models for Process Indusctries -- Chapter 6. Summary Concerning Theoretical Developments.
This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations. Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC). These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries.
ISBN: 9783030012229
Standard No.: 10.1007/978-3-030-01222-9doiSubjects--Topical Terms:
566447
Production management.
LC Class. No.: TS155-194
Dewey Class. No.: 658.5
Capacitated Lot Sizing Problems in Process Industries
LDR
:04599nam a22003855i 4500
001
1003656
003
DE-He213
005
20200629121839.0
007
cr nn 008mamaa
008
210106s2019 gw | s |||| 0|eng d
020
$a
9783030012229
$9
978-3-030-01222-9
024
7
$a
10.1007/978-3-030-01222-9
$2
doi
035
$a
978-3-030-01222-9
050
4
$a
TS155-194
072
7
$a
KJMV5
$2
bicssc
072
7
$a
BUS087000
$2
bisacsh
072
7
$a
KJMV5
$2
thema
082
0 4
$a
658.5
$2
23
100
1
$a
Ramya, Ravi.
$e
author.
$4
aut
$4
http://id.loc.gov/vocabulary/relators/aut
$3
1297046
245
1 0
$a
Capacitated Lot Sizing Problems in Process Industries
$h
[electronic resource] /
$c
by Ravi Ramya, Chandrasekharan Rajendran, Hans Ziegler, Sanjay Mohapatra, K. Ganesh.
250
$a
1st ed. 2019.
264
1
$a
Cham :
$b
Springer International Publishing :
$b
Imprint: Springer,
$c
2019.
300
$a
XXXV, 196 p. 41 illus.
$b
online resource.
336
$a
text
$b
txt
$2
rdacontent
337
$a
computer
$b
c
$2
rdamedia
338
$a
online resource
$b
cr
$2
rdacarrier
347
$a
text file
$b
PDF
$2
rda
505
0
$a
Chapter 1. Introduction -- Chapter 2. CLSP: Real Life Applications and Motivation to Study Lot Sizing Problems in Process Industries -- Chapter 3. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods (CLSP:PCSC): Mathematical Model 1 (MM1) and A Heuristic for Process Industries -- Chapter 4. Further Development: Mathematical Model 2 (MM2) and A Comprehensive Heuristic for Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods for Peocess Industries -- Chapter 5. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods Assuming Sequencedependent Setup Times and Setup Costs (CLSP-SD-PCSC): Mathematical Models for Process Indusctries -- Chapter 6. Summary Concerning Theoretical Developments.
520
$a
This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations. Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC). These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries.
650
0
$a
Production management.
$3
566447
650
0
$a
Industrial engineering.
$3
679492
650
0
$a
Production engineering.
$3
566269
650
0
$a
Operations research.
$3
573517
650
0
$a
Decision making.
$3
528319
650
1 4
$a
Production.
$3
1111231
650
2 4
$a
Industrial and Production Engineering.
$3
593943
650
2 4
$a
Operations Research/Decision Theory.
$3
669176
700
1
$a
Rajendran, Chandrasekharan.
$e
author.
$4
aut
$4
http://id.loc.gov/vocabulary/relators/aut
$3
1297047
700
1
$a
Ziegler, Hans.
$e
author.
$4
aut
$4
http://id.loc.gov/vocabulary/relators/aut
$3
1297048
700
1
$a
Mohapatra, Sanjay.
$4
aut
$4
http://id.loc.gov/vocabulary/relators/aut
$3
889607
700
1
$a
Ganesh, K.
$4
aut
$4
http://id.loc.gov/vocabulary/relators/aut
$3
1021878
710
2
$a
SpringerLink (Online service)
$3
593884
773
0
$t
Springer Nature eBook
776
0 8
$i
Printed edition:
$z
9783030012212
776
0 8
$i
Printed edition:
$z
9783030012236
856
4 0
$u
https://doi.org/10.1007/978-3-030-01222-9
912
$a
ZDB-2-BUM
912
$a
ZDB-2-SXBM
950
$a
Business and Management (SpringerNature-41169)
950
$a
Business and Management (R0) (SpringerNature-43719)
筆 0 讀者評論
多媒體
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼[密碼必須為2種組合(英文和數字)及長度為10碼以上]
登入