語系:
繁體中文
English
說明(常見問題)
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Production Planning with Capacitated...
~
Uzsoy, Reha.
Production Planning with Capacitated Resources and Congestion
紀錄類型:
書目-語言資料,印刷品 : Monograph/item
正題名/作者:
Production Planning with Capacitated Resources and Congestion/ by Hubert Missbauer, Reha Uzsoy.
作者:
Missbauer, Hubert.
其他作者:
Uzsoy, Reha.
面頁冊數:
X, 285 p. 62 illus., 42 illus. in color.online resource. :
Contained By:
Springer Nature eBook
標題:
Operations Research, Management Science. -
電子資源:
https://doi.org/10.1007/978-1-0716-0354-3
ISBN:
9781071603543
Production Planning with Capacitated Resources and Congestion
Missbauer, Hubert.
Production Planning with Capacitated Resources and Congestion
[electronic resource] /by Hubert Missbauer, Reha Uzsoy. - 1st ed. 2020. - X, 285 p. 62 illus., 42 illus. in color.online resource.
Chapter 1. Introduction -- Chapter 2. Workload and Cycle Time in the Production Unit -- Chapter 3. Production Planning and Control Frameworks -- Chapter 4. The Workload Control Approach -- Chapter 5. Planning Models with Stationary Fixed Lead Times -- Chapter 6. Time - Varying Lead Times and Iterative Multi - Model Approaches -- Chapter 7. Univariate Clearing Functions -- Chapter 8. Multivariate Clearing Functions -- Chapter 9. Lot Sizing Models Using Multidimensional Clearing Functions -- Chapter 10. Applications of Clearing Functions -- Chapter 11. Conclusions and Future Directions.
This book presents a comprehensive overview of recent developments in production planning. The monograph begins with an introductory chapter reviewing the need for these models of production planning that operate by determining time-phased releases of work into the facility or supply chain, relating these to the Manufacturing Planning and Control (MPC) and Advanced Planning and Scheduling (APS) frameworks that form the basis of most academic research and industrial practice. The extensive body of work on Workload Control is also placed in this context, and the need for improved models motivated by a discussion of the difficulties these approaches encounter. The next two chapters present a detailed review of the state of the art in optimization models based on exogenous planned lead times, examining the cases where these can take both integer and fractional values. The difficulties arising in estimating planned lead times that are consistent with factory behavior are highlighted, noting that many of these lead to non-convex optimization models. Attempts to address these difficulties by iterative multimodel approaches that combine simulation and mathematical programming are also discussed in detail. The next three chapters of the volume address the set of techniques developed using clearing functions, which represent the expected output of a resource in a planning period as a function of the expected workload of the resource during that period. The chapters on this subject propose a basic optimization model for multiple products, discuss the difficulties of this model and some possible solutions, review prior work, and discuss a number of alternative formulations of the clearing function concept with their respective advantages and disadvantages. Applications to lot sizing decisions and a number of other specific problems are also described. The volume concludes with an assessment of the state of the art described in the volume, and several directions for future work.
ISBN: 9781071603543
Standard No.: 10.1007/978-1-0716-0354-3doiSubjects--Topical Terms:
785065
Operations Research, Management Science.
LC Class. No.: HD30.23
Dewey Class. No.: 658.40301
Production Planning with Capacitated Resources and Congestion
LDR
:03940nam a22003975i 4500
001
1024521
003
DE-He213
005
20200706182931.0
007
cr nn 008mamaa
008
210318s2020 xxu| s |||| 0|eng d
020
$a
9781071603543
$9
978-1-0716-0354-3
024
7
$a
10.1007/978-1-0716-0354-3
$2
doi
035
$a
978-1-0716-0354-3
050
4
$a
HD30.23
072
7
$a
KJT
$2
bicssc
072
7
$a
BUS049000
$2
bisacsh
072
7
$a
KJT
$2
thema
072
7
$a
KJMD
$2
thema
082
0 4
$a
658.40301
$2
23
100
1
$a
Missbauer, Hubert.
$e
author.
$4
aut
$4
http://id.loc.gov/vocabulary/relators/aut
$3
1320695
245
1 0
$a
Production Planning with Capacitated Resources and Congestion
$h
[electronic resource] /
$c
by Hubert Missbauer, Reha Uzsoy.
250
$a
1st ed. 2020.
264
1
$a
New York, NY :
$b
Springer New York :
$b
Imprint: Springer,
$c
2020.
300
$a
X, 285 p. 62 illus., 42 illus. in color.
$b
online resource.
336
$a
text
$b
txt
$2
rdacontent
337
$a
computer
$b
c
$2
rdamedia
338
$a
online resource
$b
cr
$2
rdacarrier
347
$a
text file
$b
PDF
$2
rda
505
0
$a
Chapter 1. Introduction -- Chapter 2. Workload and Cycle Time in the Production Unit -- Chapter 3. Production Planning and Control Frameworks -- Chapter 4. The Workload Control Approach -- Chapter 5. Planning Models with Stationary Fixed Lead Times -- Chapter 6. Time - Varying Lead Times and Iterative Multi - Model Approaches -- Chapter 7. Univariate Clearing Functions -- Chapter 8. Multivariate Clearing Functions -- Chapter 9. Lot Sizing Models Using Multidimensional Clearing Functions -- Chapter 10. Applications of Clearing Functions -- Chapter 11. Conclusions and Future Directions.
520
$a
This book presents a comprehensive overview of recent developments in production planning. The monograph begins with an introductory chapter reviewing the need for these models of production planning that operate by determining time-phased releases of work into the facility or supply chain, relating these to the Manufacturing Planning and Control (MPC) and Advanced Planning and Scheduling (APS) frameworks that form the basis of most academic research and industrial practice. The extensive body of work on Workload Control is also placed in this context, and the need for improved models motivated by a discussion of the difficulties these approaches encounter. The next two chapters present a detailed review of the state of the art in optimization models based on exogenous planned lead times, examining the cases where these can take both integer and fractional values. The difficulties arising in estimating planned lead times that are consistent with factory behavior are highlighted, noting that many of these lead to non-convex optimization models. Attempts to address these difficulties by iterative multimodel approaches that combine simulation and mathematical programming are also discussed in detail. The next three chapters of the volume address the set of techniques developed using clearing functions, which represent the expected output of a resource in a planning period as a function of the expected workload of the resource during that period. The chapters on this subject propose a basic optimization model for multiple products, discuss the difficulties of this model and some possible solutions, review prior work, and discuss a number of alternative formulations of the clearing function concept with their respective advantages and disadvantages. Applications to lot sizing decisions and a number of other specific problems are also described. The volume concludes with an assessment of the state of the art described in the volume, and several directions for future work.
650
2 4
$a
Operations Research, Management Science.
$3
785065
650
2 4
$a
Production.
$3
1111231
650
1 4
$a
Operations Research/Decision Theory.
$3
669176
650
0
$a
Management science.
$3
719678
650
0
$a
Production management.
$3
566447
650
0
$a
Decision making.
$3
528319
650
0
$a
Operations research.
$3
573517
700
1
$a
Uzsoy, Reha.
$4
aut
$4
http://id.loc.gov/vocabulary/relators/aut
$3
783923
710
2
$a
SpringerLink (Online service)
$3
593884
773
0
$t
Springer Nature eBook
776
0 8
$i
Printed edition:
$z
9781071603529
776
0 8
$i
Printed edition:
$z
9781071603536
856
4 0
$u
https://doi.org/10.1007/978-1-0716-0354-3
912
$a
ZDB-2-BUM
912
$a
ZDB-2-SXBM
950
$a
Business and Management (SpringerNature-41169)
950
$a
Business and Management (R0) (SpringerNature-43719)
筆 0 讀者評論
多媒體
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼[密碼必須為2種組合(英文和數字)及長度為10碼以上]
登入