語系:
繁體中文
English
說明(常見問題)
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Shipbuilding Management
~
Bruce, George.
Shipbuilding Management
紀錄類型:
書目-語言資料,印刷品 : Monograph/item
正題名/作者:
Shipbuilding Management/ by George Bruce.
作者:
Bruce, George.
面頁冊數:
XXII, 216 p. 37 illus., 10 illus. in color.online resource. :
Contained By:
Springer Nature eBook
標題:
Offshore Engineering. -
電子資源:
https://doi.org/10.1007/978-981-15-8975-1
ISBN:
9789811589751
Shipbuilding Management
Bruce, George.
Shipbuilding Management
[electronic resource] /by George Bruce. - 1st ed. 2021. - XXII, 216 p. 37 illus., 10 illus. in color.online resource.
Part 1 Shipbuilding Context -- Chapter 1The shipbuilding market -- Chapter 2 Development of Shipbuilding -- Part 2 Pre-production Requirements -- Chapter 3 Ship Design -- Chapter 4 Planning -- Chapter 5 Materials Procurement -- Chapter 6 Sub-Contractors -- Part 3 Ship Construction -- Chapter 7 Shipyard Facilities and Equipment -- Chapter 8 Hull Part Preparation -- Chapter 9Hull Assembly -- Chapter 10Ship Construction -- Part 4Ship Outfitting and Testing -- Chapter 11Pipe and other systems -- Chapter 12Equipment Installation -- Chapter 13Painting -- Chapter 14Testing -- Chapter 15Completion -- Part 5Project Management -- Chapter 16Principles of project management -- Chapter 17Shipbuilding Projects -- Chapter 18Quality Assurance.
This book highlights the main features of shipbuilding management which lead to successful completion of shipbuilding projects. A brief review of the market context for the industry, its historical development are given to explain how shipbuilding arrived at its current structure. First pre-production including design, planning, cost estimating, procurement of materials and sub-contracting. Then, the production sequence outlines part preparation, hull assembly and construction, outfitting and painting, testing and completion. The importance of human resources and management organisation are explained. Building a ship is a complex project, so the principles of project management are described, first in general terms and then with specific reference to their application in shipbuilding. Finally managing the progress of a shipbuilding project and achieving completion are emphasised.
ISBN: 9789811589751
Standard No.: 10.1007/978-981-15-8975-1doiSubjects--Topical Terms:
671233
Offshore Engineering.
LC Class. No.: TA174
Dewey Class. No.: 620.0042
Shipbuilding Management
LDR
:02941nam a22004095i 4500
001
1050318
003
DE-He213
005
20210621160212.0
007
cr nn 008mamaa
008
220103s2021 si | s |||| 0|eng d
020
$a
9789811589751
$9
978-981-15-8975-1
024
7
$a
10.1007/978-981-15-8975-1
$2
doi
035
$a
978-981-15-8975-1
050
4
$a
TA174
050
4
$a
TA403.6
072
7
$a
TBD
$2
bicssc
072
7
$a
TEC016020
$2
bisacsh
072
7
$a
TBD
$2
thema
082
0 4
$a
620.0042
$2
23
100
1
$a
Bruce, George.
$e
author.
$4
aut
$4
http://id.loc.gov/vocabulary/relators/aut
$3
1354589
245
1 0
$a
Shipbuilding Management
$h
[electronic resource] /
$c
by George Bruce.
250
$a
1st ed. 2021.
264
1
$a
Singapore :
$b
Springer Singapore :
$b
Imprint: Springer,
$c
2021.
300
$a
XXII, 216 p. 37 illus., 10 illus. in color.
$b
online resource.
336
$a
text
$b
txt
$2
rdacontent
337
$a
computer
$b
c
$2
rdamedia
338
$a
online resource
$b
cr
$2
rdacarrier
347
$a
text file
$b
PDF
$2
rda
505
0
$a
Part 1 Shipbuilding Context -- Chapter 1The shipbuilding market -- Chapter 2 Development of Shipbuilding -- Part 2 Pre-production Requirements -- Chapter 3 Ship Design -- Chapter 4 Planning -- Chapter 5 Materials Procurement -- Chapter 6 Sub-Contractors -- Part 3 Ship Construction -- Chapter 7 Shipyard Facilities and Equipment -- Chapter 8 Hull Part Preparation -- Chapter 9Hull Assembly -- Chapter 10Ship Construction -- Part 4Ship Outfitting and Testing -- Chapter 11Pipe and other systems -- Chapter 12Equipment Installation -- Chapter 13Painting -- Chapter 14Testing -- Chapter 15Completion -- Part 5Project Management -- Chapter 16Principles of project management -- Chapter 17Shipbuilding Projects -- Chapter 18Quality Assurance.
520
$a
This book highlights the main features of shipbuilding management which lead to successful completion of shipbuilding projects. A brief review of the market context for the industry, its historical development are given to explain how shipbuilding arrived at its current structure. First pre-production including design, planning, cost estimating, procurement of materials and sub-contracting. Then, the production sequence outlines part preparation, hull assembly and construction, outfitting and painting, testing and completion. The importance of human resources and management organisation are explained. Building a ship is a complex project, so the principles of project management are described, first in general terms and then with specific reference to their application in shipbuilding. Finally managing the progress of a shipbuilding project and achieving completion are emphasised.
650
2 4
$a
Offshore Engineering.
$3
671233
650
2 4
$a
Quality Control, Reliability, Safety and Risk.
$3
671184
650
2 4
$a
Project Management.
$3
787187
650
1 4
$a
Engineering Design.
$3
670857
650
0
$a
Ocean engineering.
$3
857658
650
0
$a
Industrial safety.
$3
568114
650
0
$a
Reliability.
$3
573603
650
0
$a
Quality control.
$3
573723
650
0
$a
Transportation.
$3
558117
650
0
$a
Project management.
$3
558297
650
0
$a
Engineering design.
$3
560518
710
2
$a
SpringerLink (Online service)
$3
593884
773
0
$t
Springer Nature eBook
776
0 8
$i
Printed edition:
$z
9789811589744
776
0 8
$i
Printed edition:
$z
9789811589768
776
0 8
$i
Printed edition:
$z
9789811589775
856
4 0
$u
https://doi.org/10.1007/978-981-15-8975-1
912
$a
ZDB-2-ENG
912
$a
ZDB-2-SXE
950
$a
Engineering (SpringerNature-11647)
950
$a
Engineering (R0) (SpringerNature-43712)
筆 0 讀者評論
多媒體
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼[密碼必須為2種組合(英文和數字)及長度為10碼以上]
登入