語系:
繁體中文
English
說明(常見問題)
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Chances and Risks in Construction Ma...
~
SpringerLink (Online service)
Chances and Risks in Construction Management and Economics = A Systemic Approach to Dealing with Models and Uncertainties /
紀錄類型:
書目-語言資料,印刷品 : Monograph/item
正題名/作者:
Chances and Risks in Construction Management and Economics/ by Christian Hofstadler, Markus Kummer.
其他題名:
A Systemic Approach to Dealing with Models and Uncertainties /
作者:
Hofstadler, Christian.
其他作者:
Kummer, Markus.
面頁冊數:
XXXII, 696 p. 420 illus., 411 illus. in color.online resource. :
Contained By:
Springer Nature eBook
標題:
Probability Theory and Stochastic Processes. -
電子資源:
https://doi.org/10.1007/978-3-030-64014-9
ISBN:
9783030640149
Chances and Risks in Construction Management and Economics = A Systemic Approach to Dealing with Models and Uncertainties /
Hofstadler, Christian.
Chances and Risks in Construction Management and Economics
A Systemic Approach to Dealing with Models and Uncertainties /[electronic resource] :by Christian Hofstadler, Markus Kummer. - 1st ed. 2021. - XXXII, 696 p. 420 illus., 411 illus. in color.online resource. - Springer Tracts in Civil Engineering ,2366-2603. - Springer Tracts in Civil Engineering ,.
Chapter 1: Introduction -- Chapter 2: Basics -- Chapter 3: Data, Information, Knowledge, and BIM -- Chapter 4: Management of Chances and Risks -- Chapter 5: Applying the Management of Chances and Risks to Project Phases -- Chapter 6: The Fundamentals of Monte Carlo Simulations -- Chapter 7: Application of Monte Carlo Simulations -- Chapter 8: Influence of Project Lead Time and Construction Time on Project Targets -- Chapter 9: Worked Examples – Client -- Chapter 10: Worked Examples – Contractor.
The book outlines the processes of calculating and critically reviewing construction costs and times for clients and contractors in different project phases. Any project or structural analysis should yield accurate information on times, costs, and prices. The related database is more or less uncertain depending on project complexity and the circumstances of work performance. It is thus recommended to use ranges of key input parameters. This approach consistently considers uncertainties within a holistic project view, thus enhancing the plausibility and validity of specific values. Only the integration of probabilistic methods will allow for calculating and graphically representing the chance/risk ratio as a crucial project variable ultimately influencing the entire business.This book examines the systemic modeling and consideration of uncertainties when determining construction costs and times, and life-cycle costs. It contains detailed descriptions of other decision-making processes, including project preparation and planning (developer calculation, soil survey, cost estimate), work preparation (costing, pricing, construction time evaluation, resource identification, comparison of construction methods, bid analysis, contract award), and project execution (site logistics, construction method selection, construction process planning, work coordination, sourcing, determination of additional costs, trend analyses), as well as for project portfolio management as a tool relevant to all phases.
ISBN: 9783030640149
Standard No.: 10.1007/978-3-030-64014-9doiSubjects--Topical Terms:
593945
Probability Theory and Stochastic Processes.
LC Class. No.: TH438
Dewey Class. No.: 624
Chances and Risks in Construction Management and Economics = A Systemic Approach to Dealing with Models and Uncertainties /
LDR
:03501nam a22004095i 4500
001
1055750
003
DE-He213
005
20210817060613.0
007
cr nn 008mamaa
008
220103s2021 sz | s |||| 0|eng d
020
$a
9783030640149
$9
978-3-030-64014-9
024
7
$a
10.1007/978-3-030-64014-9
$2
doi
035
$a
978-3-030-64014-9
050
4
$a
TH438
072
7
$a
TNT
$2
bicssc
072
7
$a
TEC005000
$2
bisacsh
072
7
$a
TNT
$2
thema
082
0 4
$a
624
$2
23
100
1
$a
Hofstadler, Christian.
$e
editor.
$4
aut
$4
http://id.loc.gov/vocabulary/relators/aut
$3
1299178
245
1 0
$a
Chances and Risks in Construction Management and Economics
$h
[electronic resource] :
$b
A Systemic Approach to Dealing with Models and Uncertainties /
$c
by Christian Hofstadler, Markus Kummer.
250
$a
1st ed. 2021.
264
1
$a
Cham :
$b
Springer International Publishing :
$b
Imprint: Springer,
$c
2021.
300
$a
XXXII, 696 p. 420 illus., 411 illus. in color.
$b
online resource.
336
$a
text
$b
txt
$2
rdacontent
337
$a
computer
$b
c
$2
rdamedia
338
$a
online resource
$b
cr
$2
rdacarrier
347
$a
text file
$b
PDF
$2
rda
490
1
$a
Springer Tracts in Civil Engineering ,
$x
2366-2603
505
0
$a
Chapter 1: Introduction -- Chapter 2: Basics -- Chapter 3: Data, Information, Knowledge, and BIM -- Chapter 4: Management of Chances and Risks -- Chapter 5: Applying the Management of Chances and Risks to Project Phases -- Chapter 6: The Fundamentals of Monte Carlo Simulations -- Chapter 7: Application of Monte Carlo Simulations -- Chapter 8: Influence of Project Lead Time and Construction Time on Project Targets -- Chapter 9: Worked Examples – Client -- Chapter 10: Worked Examples – Contractor.
520
$a
The book outlines the processes of calculating and critically reviewing construction costs and times for clients and contractors in different project phases. Any project or structural analysis should yield accurate information on times, costs, and prices. The related database is more or less uncertain depending on project complexity and the circumstances of work performance. It is thus recommended to use ranges of key input parameters. This approach consistently considers uncertainties within a holistic project view, thus enhancing the plausibility and validity of specific values. Only the integration of probabilistic methods will allow for calculating and graphically representing the chance/risk ratio as a crucial project variable ultimately influencing the entire business.This book examines the systemic modeling and consideration of uncertainties when determining construction costs and times, and life-cycle costs. It contains detailed descriptions of other decision-making processes, including project preparation and planning (developer calculation, soil survey, cost estimate), work preparation (costing, pricing, construction time evaluation, resource identification, comparison of construction methods, bid analysis, contract award), and project execution (site logistics, construction method selection, construction process planning, work coordination, sourcing, determination of additional costs, trend analyses), as well as for project portfolio management as a tool relevant to all phases.
650
2 4
$a
Probability Theory and Stochastic Processes.
$3
593945
650
2 4
$a
Project Management.
$3
787187
650
1 4
$a
Construction Management.
$3
671020
650
0
$a
Probabilities.
$3
527847
650
0
$a
Project management.
$3
558297
650
0
$a
Construction superintendence.
$3
1254754
650
0
$a
Construction industry—Management.
$3
1254753
650
0
$a
Building—Superintendence.
$3
1254752
700
1
$a
Kummer, Markus.
$e
author.
$4
aut
$4
http://id.loc.gov/vocabulary/relators/aut
$3
1361008
710
2
$a
SpringerLink (Online service)
$3
593884
773
0
$t
Springer Nature eBook
776
0 8
$i
Printed edition:
$z
9783030640132
776
0 8
$i
Printed edition:
$z
9783030640156
776
0 8
$i
Printed edition:
$z
9783030640163
830
0
$a
Springer Tracts in Civil Engineering ,
$x
2366-259X
$3
1272849
856
4 0
$u
https://doi.org/10.1007/978-3-030-64014-9
912
$a
ZDB-2-ENG
912
$a
ZDB-2-SXE
950
$a
Engineering (SpringerNature-11647)
950
$a
Engineering (R0) (SpringerNature-43712)
筆 0 讀者評論
多媒體
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼[密碼必須為2種組合(英文和數字)及長度為10碼以上]
登入