語系:
繁體中文
English
說明(常見問題)
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Shield Tunnel Cutter Replacement Technology
紀錄類型:
書目-語言資料,印刷品 : Monograph/item
正題名/作者:
Shield Tunnel Cutter Replacement Technology/ by Jian Chen, Fanlu Min.
作者:
Chen, Jian.
其他作者:
Min, Fanlu.
面頁冊數:
XXIII, 308 p. 247 illus., 154 illus. in color.online resource. :
Contained By:
Springer Nature eBook
標題:
Fire Science, Hazard Control, Building Safety. -
電子資源:
https://doi.org/10.1007/978-981-16-4107-7
ISBN:
9789811641077
Shield Tunnel Cutter Replacement Technology
Chen, Jian.
Shield Tunnel Cutter Replacement Technology
[electronic resource] /by Jian Chen, Fanlu Min. - 1st ed. 2022. - XXIII, 308 p. 247 illus., 154 illus. in color.online resource. - Key Technologies for Tunnel Construction under Complex Geological and Environmental Conditions,2662-2912. - Key Technologies for Tunnel Construction under Complex Geological and Environmental Conditions,.
Introduction -- Cutting, Wear and Replacement of Cutting Tools During Shield Tunneling -- Conventional Cutterhead & Tool-Changing Under Normal Pressure Technology -- Normal Pressure Tool Change Technology Based on Basic Pressure and Changeable Knife Design -- Stabilization Technology and Tool Change Technology for Open Face with Pressure Open -- Other Special Tool Changing Techniques.
This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.
ISBN: 9789811641077
Standard No.: 10.1007/978-981-16-4107-7doiSubjects--Topical Terms:
1141481
Fire Science, Hazard Control, Building Safety.
LC Class. No.: TA703-705.4
Dewey Class. No.: 624.15
Shield Tunnel Cutter Replacement Technology
LDR
:02440nam a22004095i 4500
001
1084227
003
DE-He213
005
20220501005629.0
007
cr nn 008mamaa
008
221228s2022 si | s |||| 0|eng d
020
$a
9789811641077
$9
978-981-16-4107-7
024
7
$a
10.1007/978-981-16-4107-7
$2
doi
035
$a
978-981-16-4107-7
050
4
$a
TA703-705.4
072
7
$a
TNC
$2
bicssc
072
7
$a
SCI042000
$2
bisacsh
072
7
$a
TNC
$2
thema
082
0 4
$a
624.15
$2
23
100
1
$a
Chen, Jian.
$4
aut
$4
http://id.loc.gov/vocabulary/relators/aut
$3
1114540
245
1 0
$a
Shield Tunnel Cutter Replacement Technology
$h
[electronic resource] /
$c
by Jian Chen, Fanlu Min.
250
$a
1st ed. 2022.
264
1
$a
Singapore :
$b
Springer Nature Singapore :
$b
Imprint: Springer,
$c
2022.
300
$a
XXIII, 308 p. 247 illus., 154 illus. in color.
$b
online resource.
336
$a
text
$b
txt
$2
rdacontent
337
$a
computer
$b
c
$2
rdamedia
338
$a
online resource
$b
cr
$2
rdacarrier
347
$a
text file
$b
PDF
$2
rda
490
1
$a
Key Technologies for Tunnel Construction under Complex Geological and Environmental Conditions,
$x
2662-2912
505
0
$a
Introduction -- Cutting, Wear and Replacement of Cutting Tools During Shield Tunneling -- Conventional Cutterhead & Tool-Changing Under Normal Pressure Technology -- Normal Pressure Tool Change Technology Based on Basic Pressure and Changeable Knife Design -- Stabilization Technology and Tool Change Technology for Open Face with Pressure Open -- Other Special Tool Changing Techniques.
520
$a
This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.
650
2 4
$a
Fire Science, Hazard Control, Building Safety.
$3
1141481
650
2 4
$a
Transportation Technology and Traffic Engineering.
$3
1069531
650
2 4
$a
Geotechnical Engineering and Applied Earth Sciences.
$3
1366420
650
1 4
$a
Geoengineering.
$3
1365755
650
0
$a
Buildings—Protection.
$3
1366327
650
0
$a
Fire prevention.
$3
885771
650
0
$a
Traffic engineering.
$3
639529
650
0
$a
Transportation engineering.
$3
633205
650
0
$a
Geotechnical engineering.
$3
1024219
650
0
$a
Engineering geology.
$3
558458
700
1
$a
Min, Fanlu.
$e
author.
$4
aut
$4
http://id.loc.gov/vocabulary/relators/aut
$3
1390465
710
2
$a
SpringerLink (Online service)
$3
593884
773
0
$t
Springer Nature eBook
776
0 8
$i
Printed edition:
$z
9789811641060
776
0 8
$i
Printed edition:
$z
9789811641084
776
0 8
$i
Printed edition:
$z
9789811641091
830
0
$a
Key Technologies for Tunnel Construction under Complex Geological and Environmental Conditions,
$x
2662-2912
$3
1349791
856
4 0
$u
https://doi.org/10.1007/978-981-16-4107-7
912
$a
ZDB-2-ENG
912
$a
ZDB-2-SXE
950
$a
Engineering (SpringerNature-11647)
950
$a
Engineering (R0) (SpringerNature-43712)
筆 0 讀者評論
多媒體
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼[密碼必須為2種組合(英文和數字)及長度為10碼以上]
登入