語系:
繁體中文
English
說明(常見問題)
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Early Fault Detection Scheme and Opt...
~
University of Toronto (Canada).
Early Fault Detection Scheme and Optimized CBM Strategy for Gear Transmission System Operating under Varying Loads.
紀錄類型:
書目-語言資料,印刷品 : Monograph/item
正題名/作者:
Early Fault Detection Scheme and Optimized CBM Strategy for Gear Transmission System Operating under Varying Loads./
作者:
Yang, Ming.
面頁冊數:
114 p.
附註:
Source: Dissertation Abstracts International, Volume: 73-04, Section: B, page: .
Contained By:
Dissertation Abstracts International73-04B.
標題:
Engineering, Mechanical. -
電子資源:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=NR77684
ISBN:
9780494776841
Early Fault Detection Scheme and Optimized CBM Strategy for Gear Transmission System Operating under Varying Loads.
Yang, Ming.
Early Fault Detection Scheme and Optimized CBM Strategy for Gear Transmission System Operating under Varying Loads.
- 114 p.
Source: Dissertation Abstracts International, Volume: 73-04, Section: B, page: .
Thesis (Ph.D.)--University of Toronto (Canada), 2011.
The development of fault detection schemes and optimized condition-based maintenance (CBM) strategies for gear transmission systems has received considerable attention in recent years. Most models considered the gear systems operating under constant load. Constant load assumptions imply that changes in condition monitoring data are caused only by deterioration of the gear systems. However, most real gear systems operate under varying loads and speeds which affect the condition monitoring data signature of the system. This typically makes it difficult to recognize the occurrence of an impending fault and to optimize a CBM strategy.
ISBN: 9780494776841Subjects--Topical Terms:
845387
Engineering, Mechanical.
Early Fault Detection Scheme and Optimized CBM Strategy for Gear Transmission System Operating under Varying Loads.
LDR
:02834nam 2200265 4500
001
712965
005
20121003100319.5
008
121101s2011 ||||||||||||||||| ||eng d
020
$a
9780494776841
035
$a
(UMI)AAINR77684
035
$a
AAINR77684
040
$a
UMI
$c
UMI
100
1
$a
Yang, Ming.
$3
845501
245
1 0
$a
Early Fault Detection Scheme and Optimized CBM Strategy for Gear Transmission System Operating under Varying Loads.
300
$a
114 p.
500
$a
Source: Dissertation Abstracts International, Volume: 73-04, Section: B, page: .
502
$a
Thesis (Ph.D.)--University of Toronto (Canada), 2011.
520
$a
The development of fault detection schemes and optimized condition-based maintenance (CBM) strategies for gear transmission systems has received considerable attention in recent years. Most models considered the gear systems operating under constant load. Constant load assumptions imply that changes in condition monitoring data are caused only by deterioration of the gear systems. However, most real gear systems operate under varying loads and speeds which affect the condition monitoring data signature of the system. This typically makes it difficult to recognize the occurrence of an impending fault and to optimize a CBM strategy.
520
$a
This thesis first presents a novel approach to detect and localize the gear failure occurrence for a gear system operating under varying load conditions. An autoregressive model with exogenous variables is fitted to the time-synchronously averaged (TSA) condition monitoring data when the gear transmission system operated under various load conditions in good state. The fault detection and localization indicator is calculated by applying F-test to the residual signals of the ARX model. Then, the gear deteriorating process is modeled as a three state hidden continuous Markov model with partial information, and the model parameters are estimated using ARX model residuals. The pseudo likelihood function is maximized and the EM algorithm is applied.
520
$a
Finally, a multivariate Bayesian process control is developed to optimize the decision variables of the CBM strategy: the time interval for next data collection and the control limit for the posterior probability calculated at next data collection epoch. The decision variables are calculated by minimizing the total expected cost from current stage to the end of the production run. Dynamic programming is applied to update the decision variables after new monitoring data are acquired, and the maintenance decision is made by taking all available information into account.
590
$a
School code: 0779.
650
4
$a
Engineering, Mechanical.
$3
845387
690
$a
0548
710
2
$a
University of Toronto (Canada).
$b
Mechanical and Industrial Engineering.
$3
845502
773
0
$t
Dissertation Abstracts International
$g
73-04B.
790
$a
0779
791
$a
Ph.D.
792
$a
2011
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=NR77684
筆 0 讀者評論
多媒體
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼[密碼必須為2種組合(英文和數字)及長度為10碼以上]
登入