語系:
繁體中文
English
說明(常見問題)
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Conceptual Framework for adapting Te...
~
Agee, Ross E.
Conceptual Framework for adapting Technical Performance Measurement Methodology for Early Stage Research and Development Projects.
紀錄類型:
書目-語言資料,手稿 : Monograph/item
正題名/作者:
Conceptual Framework for adapting Technical Performance Measurement Methodology for Early Stage Research and Development Projects./
作者:
Agee, Ross E.
面頁冊數:
1 online resource (101 pages)
附註:
Source: Dissertation Abstracts International, Volume: 79-02(E), Section: B.
Contained By:
Dissertation Abstracts International79-02B(E).
標題:
Engineering. -
電子資源:
click for full text (PQDT)
ISBN:
9780355430400
Conceptual Framework for adapting Technical Performance Measurement Methodology for Early Stage Research and Development Projects.
Agee, Ross E.
Conceptual Framework for adapting Technical Performance Measurement Methodology for Early Stage Research and Development Projects.
- 1 online resource (101 pages)
Source: Dissertation Abstracts International, Volume: 79-02(E), Section: B.
Thesis (D.Engr.)
Includes bibliographical references
Early stage research and development (R&D) projects, programs, or efforts are characterized by a high degree of uncertainty. In the public sector, these efforts are defined as those with technology readiness levels up to 4. Both project management and systems engineering cultures proliferate throughout the public sector. Project management traditionally uses earned value management system to track the progress of its projects. Systems engineers apply Technical Performance Measurement methodology (TPM) to R&D efforts to monitor progress of quality factors with respect to those efforts. Both of these methods have numerous alternative implementations, and both strive to provide risk management indicators and insight into future performance. This paper discusses a conceptual framework for monitoring early stage R&D by altering a TPM method. By quantifying and monitoring the "learning" or technical uncertainty toward the project goal, early stage R&D is given a measurement for technical progress. Learning values are determined using pairwise comparisons of R&D activities that contribute to learning. How the effort increases learning, or degrades uncertainty, over time serves as the baseline for performance management. In order to predict future performance, the learning baseline is regressed in linear segments. Using simulated project status, those predictions are shown to have acceptable uncertainty by validating against prediction intervals.
Electronic reproduction.
Ann Arbor, Mich. :
ProQuest,
2018
Mode of access: World Wide Web
ISBN: 9780355430400Subjects--Topical Terms:
561152
Engineering.
Index Terms--Genre/Form:
554714
Electronic books.
Conceptual Framework for adapting Technical Performance Measurement Methodology for Early Stage Research and Development Projects.
LDR
:02826ntm a2200349Ki 4500
001
910033
005
20180511093034.5
006
m o u
007
cr mn||||a|a||
008
190606s2018 xx obm 000 0 eng d
020
$a
9780355430400
035
$a
(MiAaPQ)AAI10636922
035
$a
(MiAaPQ)gwu:13833
035
$a
AAI10636922
040
$a
MiAaPQ
$b
eng
$c
MiAaPQ
099
$a
TUL
$f
hyy
$c
available through World Wide Web
100
1
$a
Agee, Ross E.
$3
1181093
245
1 0
$a
Conceptual Framework for adapting Technical Performance Measurement Methodology for Early Stage Research and Development Projects.
264
0
$c
2018
300
$a
1 online resource (101 pages)
336
$a
text
$b
txt
$2
rdacontent
337
$a
computer
$b
c
$2
rdamedia
338
$a
online resource
$b
cr
$2
rdacarrier
500
$a
Source: Dissertation Abstracts International, Volume: 79-02(E), Section: B.
500
$a
Advisers: Justin Eggstaff; Muhammed Islam.
502
$a
Thesis (D.Engr.)
$c
The George Washington University
$d
2018.
504
$a
Includes bibliographical references
520
$a
Early stage research and development (R&D) projects, programs, or efforts are characterized by a high degree of uncertainty. In the public sector, these efforts are defined as those with technology readiness levels up to 4. Both project management and systems engineering cultures proliferate throughout the public sector. Project management traditionally uses earned value management system to track the progress of its projects. Systems engineers apply Technical Performance Measurement methodology (TPM) to R&D efforts to monitor progress of quality factors with respect to those efforts. Both of these methods have numerous alternative implementations, and both strive to provide risk management indicators and insight into future performance. This paper discusses a conceptual framework for monitoring early stage R&D by altering a TPM method. By quantifying and monitoring the "learning" or technical uncertainty toward the project goal, early stage R&D is given a measurement for technical progress. Learning values are determined using pairwise comparisons of R&D activities that contribute to learning. How the effort increases learning, or degrades uncertainty, over time serves as the baseline for performance management. In order to predict future performance, the learning baseline is regressed in linear segments. Using simulated project status, those predictions are shown to have acceptable uncertainty by validating against prediction intervals.
533
$a
Electronic reproduction.
$b
Ann Arbor, Mich. :
$c
ProQuest,
$d
2018
538
$a
Mode of access: World Wide Web
650
4
$a
Engineering.
$3
561152
650
4
$a
Management.
$3
558618
655
7
$a
Electronic books.
$2
local
$3
554714
690
$a
0537
690
$a
0454
710
2
$a
ProQuest Information and Learning Co.
$3
1178819
710
2
$a
The George Washington University.
$b
Engineering Management.
$3
1179162
773
0
$t
Dissertation Abstracts International
$g
79-02B(E).
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10636922
$z
click for full text (PQDT)
筆 0 讀者評論
多媒體
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼[密碼必須為2種組合(英文和數字)及長度為10碼以上]
登入