語系:
繁體中文
English
說明(常見問題)
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Causes of delay in construction proj...
~
Qatar University (Qatar).
Causes of delay in construction projects.
紀錄類型:
書目-語言資料,手稿 : Monograph/item
正題名/作者:
Causes of delay in construction projects./
作者:
Abu Hassan, Mohanad H. A.
面頁冊數:
1 online resource (124 pages)
附註:
Source: Masters Abstracts International, Volume: 55-04.
Contained By:
Masters Abstracts International55-04(E).
標題:
Architectural engineering. -
電子資源:
click for full text (PQDT)
ISBN:
9781339647920
Causes of delay in construction projects.
Abu Hassan, Mohanad H. A.
Causes of delay in construction projects.
- 1 online resource (124 pages)
Source: Masters Abstracts International, Volume: 55-04.
Thesis (M.S.)
Includes bibliographical references
This item is not available from ProQuest Dissertations & Theses.
The construction industry is struggling by numerous recorded incidents of delay due to improper planning and/or implementation of required construction measures. Globally, researchers have concluded that the construction environment is overloaded with more frequent delays when compared to other labor enforced industries. Over the past decade, infrastructure and project development in developing countries have experienced major growth. Since there are huge investments on construction activities that all of a sudden happen in a very narrow considerable construction period, it is expected that construction fields suffer from severe delays during construction. Construction stakeholders need to enforce huge efforts to facilitate the smooth flow of construction projects. The aim and objective of this project is to identify the most significant delay attributes affecting the construction industry. After a review of the literature, a list of 42 delay attributes were gathered and presented in a survey questionnaire. The survey was distributed through online website and sent to various experts in the construction industry. 179 complete responses were received and analyzed by importance index, Spearman's rank correlation, T-Test, risk mapping and factor analysis. As a result, it was found "low productivity of labor", "delay in decision making", "changes to the project by owner", "delays related to subcontractors work", and "unqualified workforce" were ranked as the most significant delay attributes in construction industry respectively.
Electronic reproduction.
Ann Arbor, Mich. :
ProQuest,
2018
Mode of access: World Wide Web
ISBN: 9781339647920Subjects--Topical Terms:
1180400
Architectural engineering.
Index Terms--Genre/Form:
554714
Electronic books.
Causes of delay in construction projects.
LDR
:02873ntm a2200373Ki 4500
001
910340
005
20180517123953.5
006
m o u
007
cr mn||||a|a||
008
190606s2016 xx obm 000 0 eng d
020
$a
9781339647920
035
$a
(MiAaPQ)AAI10100923
035
$a
(MiAaPQ)qatar:10014
035
$a
AAI10100923
040
$a
MiAaPQ
$b
eng
$c
MiAaPQ
099
$a
TUL
$f
hyy
$c
available through World Wide Web
100
1
$a
Abu Hassan, Mohanad H. A.
$3
1181573
245
1 0
$a
Causes of delay in construction projects.
264
0
$c
2016
300
$a
1 online resource (124 pages)
336
$a
text
$b
txt
$2
rdacontent
337
$a
computer
$b
c
$2
rdamedia
338
$a
online resource
$b
cr
$2
rdacarrier
500
$a
Source: Masters Abstracts International, Volume: 55-04.
500
$a
Adviser: Murat Gunduz.
502
$a
Thesis (M.S.)
$c
Qatar University (Qatar)
$d
2016.
504
$a
Includes bibliographical references
506
$a
This item is not available from ProQuest Dissertations & Theses.
520
$a
The construction industry is struggling by numerous recorded incidents of delay due to improper planning and/or implementation of required construction measures. Globally, researchers have concluded that the construction environment is overloaded with more frequent delays when compared to other labor enforced industries. Over the past decade, infrastructure and project development in developing countries have experienced major growth. Since there are huge investments on construction activities that all of a sudden happen in a very narrow considerable construction period, it is expected that construction fields suffer from severe delays during construction. Construction stakeholders need to enforce huge efforts to facilitate the smooth flow of construction projects. The aim and objective of this project is to identify the most significant delay attributes affecting the construction industry. After a review of the literature, a list of 42 delay attributes were gathered and presented in a survey questionnaire. The survey was distributed through online website and sent to various experts in the construction industry. 179 complete responses were received and analyzed by importance index, Spearman's rank correlation, T-Test, risk mapping and factor analysis. As a result, it was found "low productivity of labor", "delay in decision making", "changes to the project by owner", "delays related to subcontractors work", and "unqualified workforce" were ranked as the most significant delay attributes in construction industry respectively.
533
$a
Electronic reproduction.
$b
Ann Arbor, Mich. :
$c
ProQuest,
$d
2018
538
$a
Mode of access: World Wide Web
650
4
$a
Architectural engineering.
$3
1180400
650
4
$a
Management.
$3
558618
650
4
$a
Labor economics.
$3
554775
655
7
$a
Electronic books.
$2
local
$3
554714
690
$a
0462
690
$a
0454
690
$a
0510
710
2
$a
ProQuest Information and Learning Co.
$3
1178819
710
2
$a
Qatar University (Qatar).
$b
Engineering Management.
$3
1181574
773
0
$t
Masters Abstracts International
$g
55-04(E).
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10100923
$z
click for full text (PQDT)
筆 0 讀者評論
多媒體
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼[密碼必須為2種組合(英文和數字)及長度為10碼以上]
登入