Hybrid Fuzzy-Bayesian Dynamic Decisi...
~
University of Missouri - Kansas City.
Hybrid Fuzzy-Bayesian Dynamic Decision Support Tool for Resource-Based Scheduling of Construction Projects.
紀錄類型:
書目-語言資料,手稿 : Monograph/item
正題名/作者:
Hybrid Fuzzy-Bayesian Dynamic Decision Support Tool for Resource-Based Scheduling of Construction Projects./
作者:
Rezakhani, Pejman.
面頁冊數:
1 online resource (182 pages)
附註:
Source: Dissertation Abstracts International, Volume: 79-02(E), Section: B.
Contained By:
Dissertation Abstracts International79-02B(E).
標題:
Civil engineering. -
電子資源:
click for full text (PQDT)
ISBN:
9780355242942
Hybrid Fuzzy-Bayesian Dynamic Decision Support Tool for Resource-Based Scheduling of Construction Projects.
Rezakhani, Pejman.
Hybrid Fuzzy-Bayesian Dynamic Decision Support Tool for Resource-Based Scheduling of Construction Projects.
- 1 online resource (182 pages)
Source: Dissertation Abstracts International, Volume: 79-02(E), Section: B.
Thesis (Ph.D.)
Includes bibliographical references
This dissertation proposes a flexible and intelligent decision support tool for scheduling and resource allocation of construction projects. A hybrid Fuzzy-Bayesian scheduling network and a new optimization model and solution approach have been developed to assess the combinatory effect of different risk factors on scheduling and optimize the time-cost trade off. Developed decision support tool employs interval-valued fuzzy numbers and Bayesian networks to dynamically quantify uncertainty and predict project performance during its make-span. Using interval-valued fuzzy numbers makes the model more flexible and intelligent comparing to conventional fuzzy risk assessment models through incorporating the decision makers` confidence degree. The linguistic assessments of experts regarding the likelihood and severity of increase or decrease in task duration and cost when influenced by different risk factors are used to generate a set of duration and cost prior-probability distributions.
Electronic reproduction.
Ann Arbor, Mich. :
ProQuest,
2018
Mode of access: World Wide Web
ISBN: 9780355242942Subjects--Topical Terms:
561339
Civil engineering.
Index Terms--Genre/Form:
554714
Electronic books.
Hybrid Fuzzy-Bayesian Dynamic Decision Support Tool for Resource-Based Scheduling of Construction Projects.
LDR
:03524ntm a2200349Ki 4500
001
911290
005
20180529081902.5
006
m o u
007
cr mn||||a|a||
008
190606s2017 xx obm 000 0 eng d
020
$a
9780355242942
035
$a
(MiAaPQ)AAI10619616
035
$a
(MiAaPQ)umkc:11156
035
$a
AAI10619616
040
$a
MiAaPQ
$b
eng
$c
MiAaPQ
099
$a
TUL
$f
hyy
$c
available through World Wide Web
100
1
$a
Rezakhani, Pejman.
$3
1183002
245
1 0
$a
Hybrid Fuzzy-Bayesian Dynamic Decision Support Tool for Resource-Based Scheduling of Construction Projects.
264
0
$c
2017
300
$a
1 online resource (182 pages)
336
$a
text
$b
txt
$2
rdacontent
337
$a
computer
$b
c
$2
rdamedia
338
$a
online resource
$b
cr
$2
rdacarrier
500
$a
Source: Dissertation Abstracts International, Volume: 79-02(E), Section: B.
500
$a
Adviser: Ceki Halmen.
502
$a
Thesis (Ph.D.)
$c
University of Missouri - Kansas City
$d
2017.
504
$a
Includes bibliographical references
520
$a
This dissertation proposes a flexible and intelligent decision support tool for scheduling and resource allocation of construction projects. A hybrid Fuzzy-Bayesian scheduling network and a new optimization model and solution approach have been developed to assess the combinatory effect of different risk factors on scheduling and optimize the time-cost trade off. Developed decision support tool employs interval-valued fuzzy numbers and Bayesian networks to dynamically quantify uncertainty and predict project performance during its make-span. Using interval-valued fuzzy numbers makes the model more flexible and intelligent comparing to conventional fuzzy risk assessment models through incorporating the decision makers` confidence degree. The linguistic assessments of experts regarding the likelihood and severity of increase or decrease in task duration and cost when influenced by different risk factors are used to generate a set of duration and cost prior-probability distributions.
520
$a
A learning dynamic Bayesian scheduling network is developed to probabilistically combine the prior-probability distributions with initial activity duration estimates and update them as new evidence in form of actual activity data feed into the network. This model also predicts project performance at any point of time during its execution. Optimization model explicitly considers variation of time-cost trade off relationship during project execution and complex payment terms to maximize the project net present value (NPV). A sequential solution approach is proposed to combine a procedure for updating time-cost trade off data, and mixed-integer linear programming (MILP) methods to obtain optimal project crashing and scheduling solutions that is adaptive to the current project status and crew productivity. Capability of proposed model in quantifying uncertainty at initial phases of project where project performance data are scarce, learning from data and predicting project performance, considering financial aspects of scheduling through optimal resource allocation and providing useful and clear advice to managers are advantages of developed decision support tool over already existing approaches.
533
$a
Electronic reproduction.
$b
Ann Arbor, Mich. :
$c
ProQuest,
$d
2018
538
$a
Mode of access: World Wide Web
650
4
$a
Civil engineering.
$3
561339
655
7
$a
Electronic books.
$2
local
$3
554714
690
$a
0543
710
2
$a
ProQuest Information and Learning Co.
$3
1178819
710
2
$a
University of Missouri - Kansas City.
$b
Civil Engineering.
$3
1183003
773
0
$t
Dissertation Abstracts International
$g
79-02B(E).
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10619616
$z
click for full text (PQDT)
筆 0 讀者評論
多媒體
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼[密碼必須為2種組合(英文和數字)及長度為10碼以上]
登入