語系:
繁體中文
English
說明(常見問題)
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Performance Analysis of an Updraft T...
~
Purdue University.
Performance Analysis of an Updraft Tower System for Dry Cooling in Large-Scale Power Plants.
紀錄類型:
書目-語言資料,手稿 : Monograph/item
正題名/作者:
Performance Analysis of an Updraft Tower System for Dry Cooling in Large-Scale Power Plants./
作者:
Liu, Haotian.
面頁冊數:
1 online resource (89 pages)
附註:
Source: Masters Abstracts International, Volume: 56-06.
標題:
Mechanical engineering. -
電子資源:
click for full text (PQDT)
ISBN:
9780355156737
Performance Analysis of an Updraft Tower System for Dry Cooling in Large-Scale Power Plants.
Liu, Haotian.
Performance Analysis of an Updraft Tower System for Dry Cooling in Large-Scale Power Plants.
- 1 online resource (89 pages)
Source: Masters Abstracts International, Volume: 56-06.
Thesis (M.S.M.E.)--Purdue University, 2017.
Includes bibliographical references
An updraft tower cooling system is proposed to eliminate water use and utilize heat rejection in large-scale power plants. The updraft tower has an annular heat exchanger distributed around an inlet at the base; ambient air is drawn up through the tower chimney due to the density difference between the heated air at the base and the cooler air at the top. A secondary loop, configured as a vapor-compression cooling cycle, is used to transfer the heat from the power plant condenser to the tower base. Recuperative turbines in the tower harness the energy available in the waste heat air stream to assist in powering the secondary cooling cycle and increase the cooling system efficiency. The system feasibility is evaluated from thermodynamic perspective by comparing the net power needed to operate the system versus alternative dry cooling schemes. A detailed thermodynamic model coupling the power plant, secondary loop, and updraft tower systems is developed. Parametric studies involving changes in updraft tower geometry, heat exchanger size, and operating conditions are conducted to develop system design methodologies for optimized performance; water, R134a, R600a, and R290 are evaluated as alternative secondary cooling cycle refrigerants. The size of the updraft tower is critical to the system performance. Increases in the tower diameter and height (up to reasonable construction limits) increase the system work output. The cooling system efficiency can be improved by lowering the secondary loop condensing temperature to reduce the compression work, but this requires a larger size tower to maintain the same heat rejection rate. Similarly, increasing the secondary loop evaporating temperature can reduce the compression work, but requires a larger heat exchange surface area. An optimum depth of the heat exchanger at the tower base (i.e., the secondary loop condenser) is identified that maximizes the work output. For an optimized system design, the required work input to the updraft tower cooling system is shown to be less than for a typical air-cooled condenser at the same heat rejection rate. By allowing the power plant condensing temperature to increase, a simple pumped loop can be used to replace the secondary vapor-compression cooling cycle as the secondary loop. With the same updraft tower parameters and heat exchangers design, the simulation model predicts the pumped loop provides better performance and consumes less power as compared to the vapor compression loop. With a tower height similar to existing water-cooled cooling towers, the updraft tower system with a pumped secondary loop can allow for dry cooling with significantly less efficiency penalty compared to air-cooled condensers. This work provides a framework for judgement of the updraft tower dry cooling system feasibility from a thermodynamic perspective.
Electronic reproduction.
Ann Arbor, Mich. :
ProQuest,
2018
Mode of access: World Wide Web
ISBN: 9780355156737Subjects--Topical Terms:
557493
Mechanical engineering.
Index Terms--Genre/Form:
554714
Electronic books.
Performance Analysis of an Updraft Tower System for Dry Cooling in Large-Scale Power Plants.
LDR
:04018ntm a2200313K 4500
001
914922
005
20180727091501.5
006
m o u
007
cr mn||||a|a||
008
190606s2017 xx obm 000 0 eng d
020
$a
9780355156737
035
$a
(MiAaPQ)AAI10266173
035
$a
(MiAaPQ)purdue:21091
035
$a
AAI10266173
040
$a
MiAaPQ
$b
eng
$c
MiAaPQ
100
1
$a
Liu, Haotian.
$3
1148506
245
1 0
$a
Performance Analysis of an Updraft Tower System for Dry Cooling in Large-Scale Power Plants.
264
0
$c
2017
300
$a
1 online resource (89 pages)
336
$a
text
$b
txt
$2
rdacontent
337
$a
computer
$b
c
$2
rdamedia
338
$a
online resource
$b
cr
$2
rdacarrier
500
$a
Source: Masters Abstracts International, Volume: 56-06.
500
$a
Advisers: Eckhard A. Groll; Jusitin A. Weibel.
502
$a
Thesis (M.S.M.E.)--Purdue University, 2017.
504
$a
Includes bibliographical references
520
$a
An updraft tower cooling system is proposed to eliminate water use and utilize heat rejection in large-scale power plants. The updraft tower has an annular heat exchanger distributed around an inlet at the base; ambient air is drawn up through the tower chimney due to the density difference between the heated air at the base and the cooler air at the top. A secondary loop, configured as a vapor-compression cooling cycle, is used to transfer the heat from the power plant condenser to the tower base. Recuperative turbines in the tower harness the energy available in the waste heat air stream to assist in powering the secondary cooling cycle and increase the cooling system efficiency. The system feasibility is evaluated from thermodynamic perspective by comparing the net power needed to operate the system versus alternative dry cooling schemes. A detailed thermodynamic model coupling the power plant, secondary loop, and updraft tower systems is developed. Parametric studies involving changes in updraft tower geometry, heat exchanger size, and operating conditions are conducted to develop system design methodologies for optimized performance; water, R134a, R600a, and R290 are evaluated as alternative secondary cooling cycle refrigerants. The size of the updraft tower is critical to the system performance. Increases in the tower diameter and height (up to reasonable construction limits) increase the system work output. The cooling system efficiency can be improved by lowering the secondary loop condensing temperature to reduce the compression work, but this requires a larger size tower to maintain the same heat rejection rate. Similarly, increasing the secondary loop evaporating temperature can reduce the compression work, but requires a larger heat exchange surface area. An optimum depth of the heat exchanger at the tower base (i.e., the secondary loop condenser) is identified that maximizes the work output. For an optimized system design, the required work input to the updraft tower cooling system is shown to be less than for a typical air-cooled condenser at the same heat rejection rate. By allowing the power plant condensing temperature to increase, a simple pumped loop can be used to replace the secondary vapor-compression cooling cycle as the secondary loop. With the same updraft tower parameters and heat exchangers design, the simulation model predicts the pumped loop provides better performance and consumes less power as compared to the vapor compression loop. With a tower height similar to existing water-cooled cooling towers, the updraft tower system with a pumped secondary loop can allow for dry cooling with significantly less efficiency penalty compared to air-cooled condensers. This work provides a framework for judgement of the updraft tower dry cooling system feasibility from a thermodynamic perspective.
533
$a
Electronic reproduction.
$b
Ann Arbor, Mich. :
$c
ProQuest,
$d
2018
538
$a
Mode of access: World Wide Web
650
4
$a
Mechanical engineering.
$3
557493
655
7
$a
Electronic books.
$2
local
$3
554714
690
$a
0548
710
2
$a
ProQuest Information and Learning Co.
$3
1178819
710
2
$a
Purdue University.
$b
Mechanical Engineering.
$3
845672
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10266173
$z
click for full text (PQDT)
筆 0 讀者評論
多媒體
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼[密碼必須為2種組合(英文和數字)及長度為10碼以上]
登入