Language:
English
繁體中文
Help
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
Reducing the Time and Cost Overruns ...
~
The George Washington University.
Reducing the Time and Cost Overruns for Aerospace Development Programs Using Precedence Networks Patterns.
Record Type:
Language materials, printed : Monograph/item
Title/Author:
Reducing the Time and Cost Overruns for Aerospace Development Programs Using Precedence Networks Patterns./
Author:
Button, Scott D.
Published:
Ann Arbor : ProQuest Dissertations & Theses, : 2019,
Description:
134 p.
Notes:
Source: Dissertations Abstracts International, Volume: 80-06, Section: A.
Contained By:
Dissertations Abstracts International80-06A.
Subject:
Information Technology. -
Online resource:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10981303
ISBN:
9780438701861
Reducing the Time and Cost Overruns for Aerospace Development Programs Using Precedence Networks Patterns.
Button, Scott D.
Reducing the Time and Cost Overruns for Aerospace Development Programs Using Precedence Networks Patterns.
- Ann Arbor : ProQuest Dissertations & Theses, 2019 - 134 p.
Source: Dissertations Abstracts International, Volume: 80-06, Section: A.
Thesis (D.Engr.)--The George Washington University, 2019.
This item must not be added to any third party search indexes.
Many commercial and defense product development programs are large-scale, complex, and contain significant innovation. Such programs often suffer cost and schedule over-runs. The goal of this work is to increase the production rate of well-ordered precedence networks for complex, large-scale aerospace product development. Earlier work in correspondence pattern automation enabled the automatic selection of inputs based on name matching. This praxis pursued broadening the scope to evaluate patterns of nodes and inputs. This research will accelerate the identification and reuse of patterns resident in project precedence networks, enabling a reduction in time and cost overruns for aerospace Product Development. This work has applied link prediction techniques developed for social network analysis to a recommendation system which augments human selection of inputs during precedence network development. This work also introduces the Triad Significance Profile for a project management precedence network. Using the link prediction techniques developed in social network analysis, and using a triadic closure algorithm developed in this praxis, it is shown that inputs may be predicted for the studied product development network, with reasonable prediction accuracy.
ISBN: 9780438701861Subjects--Topical Terms:
845446
Information Technology.
Subjects--Index Terms:
Motif
Reducing the Time and Cost Overruns for Aerospace Development Programs Using Precedence Networks Patterns.
LDR
:02705nam a2200421 4500
001
951765
005
20200821052150.5
008
200914s2019 ||||||||||||||||| ||eng d
020
$a
9780438701861
035
$a
(MiAaPQ)AAI10981303
035
$a
(MiAaPQ)gwu:14466
035
$a
AAI10981303
040
$a
MiAaPQ
$c
MiAaPQ
100
1
$a
Button, Scott D.
$3
1241229
245
1 0
$a
Reducing the Time and Cost Overruns for Aerospace Development Programs Using Precedence Networks Patterns.
260
1
$a
Ann Arbor :
$b
ProQuest Dissertations & Theses,
$c
2019
300
$a
134 p.
500
$a
Source: Dissertations Abstracts International, Volume: 80-06, Section: A.
500
$a
Publisher info.: Dissertation/Thesis.
500
$a
Advisor: Etemadi, Amir H.;Malalla, Ebrahim A.
502
$a
Thesis (D.Engr.)--The George Washington University, 2019.
506
$a
This item must not be added to any third party search indexes.
506
$a
This item must not be sold to any third party vendors.
520
$a
Many commercial and defense product development programs are large-scale, complex, and contain significant innovation. Such programs often suffer cost and schedule over-runs. The goal of this work is to increase the production rate of well-ordered precedence networks for complex, large-scale aerospace product development. Earlier work in correspondence pattern automation enabled the automatic selection of inputs based on name matching. This praxis pursued broadening the scope to evaluate patterns of nodes and inputs. This research will accelerate the identification and reuse of patterns resident in project precedence networks, enabling a reduction in time and cost overruns for aerospace Product Development. This work has applied link prediction techniques developed for social network analysis to a recommendation system which augments human selection of inputs during precedence network development. This work also introduces the Triad Significance Profile for a project management precedence network. Using the link prediction techniques developed in social network analysis, and using a triadic closure algorithm developed in this praxis, it is shown that inputs may be predicted for the studied product development network, with reasonable prediction accuracy.
590
$a
School code: 0075.
650
4
$a
Information Technology.
$3
845446
650
4
$a
Engineering.
$3
561152
650
4
$a
Information science.
$3
561178
653
$a
Motif
653
$a
Pattern
653
$a
Precedence network
653
$a
Program management
653
$a
Project management
653
$a
Recommendation system
690
$a
0489
690
$a
0537
690
$a
0723
710
2
$a
The George Washington University.
$b
Engineering Management.
$3
1179162
773
0
$t
Dissertations Abstracts International
$g
80-06A.
790
$a
0075
791
$a
D.Engr.
792
$a
2019
793
$a
English
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10981303
based on 0 review(s)
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login